All features
From estimate to signed job in minutes.

Arrow Quote Builder

Describe the work or paste in a job outline to draft a detailed quote with labor and material line items. Set your own rates, review and edit the quote, and send it to your customer. When a customer accepts, TradesArrow creates a linked job with the quote details. Add the quote’s materials to a purchasing list, or create a matching invoice.

Inside the product

See how it works in the real app

Real TradesArrow screens automatically rotate below. Use the arrows or dots to explore at your own pace.

Build detailed, professional quotes without starting from scratch.

Screenshot 1 of 1

TradesArrow

Quotes

Active

3

Total value

$23.9k

Accepted

$12.9k

QR-0088

Kitchen Backsplash

Sarah Mitchell

$2,589.50

DraftView quote →

QR-0087

Primary Bath Remodel

Dave Kowalski

$8,420.00

SentView quote →

QR-0086

Exterior Paint

Greenview Property

$12,900.00

AcceptedView quote →
DashboardJobsQuotesMore
Quotes

Kitchen Backsplash

QR-0088Tile InstallationSarah Mitchell
Line Items

Site protection & prep

Labor

Qty

1

Unit price

$150.00

Total

$150.00

Existing backsplash demolition

Labor

Qty

1

Unit price

$350.00

Total

$350.00

Substrate/drywall repair & prep

Labor

Qty

1

Unit price

$200.00

Total

$200.00

Layout & precision cuts

Labor

Qty

1

Unit price

$250.00

Total

$250.00

Tile installation (40 SQFT)

Labor

Qty

40

Unit price

$18.00

Total

$720.00

Grout & finish (40 SQFT)

Labor

Qty

40

Unit price

$4.00

Total

$160.00

Cleanup/final inspection

Labor

Qty

1

Unit price

$100.00

Total

$100.00

White subway tile w/ waste factor

Material

Qty

45

Unit price

$8.50

Total

$382.50

Thinset mortar

Material

Qty

2

Unit price

$25.00

Total

$50.00

Premium Grout

Material

Qty

1

Unit price

$45.00

Total

$45.00

Leveling spacers/clips

Material

Qty

1

Unit price

$35.00

Total

$35.00

Metal edge trim

Material

Qty

4

Unit price

$18.00

Total

$72.00

Backer/patch materials

Material

Qty

1

Unit price

$40.00

Total

$40.00

Sealant/protection supplies

Material

Qty

1

Unit price

$35.00

Total

$35.00

Quote total
$2,589.50
Customer Notes
Estimate includes removal of existing tile and installation of new white subway tile per customer request. Labor rates standard. Valid for 30 days.

Elevated Installs

555-0199 • contact@elevatedinstalls.com

123 Main Street
City, State 12345

QUOTE

QR-0088

Kitchen Backsplash

Customer: Sarah MitchellJob: Tile InstallationStatus: DraftDate: Oct 15, 2023

Preparation & Demolition

$700.00
Included work
Site protection & prep
Existing backsplash demolition
Substrate/drywall repair & prep

Tile Installation

$970.00
Included work
Layout & precision cuts
Tile installation (40 SQFT)

Grout, Finish & Cleanup

$260.00
Included work
Grout & finish (40 SQFT)
Cleanup & final inspection

Materials & Supplies

$659.50
Included work
White subway tile with waste factor
Mortar, grout, spacers, edge trim & supplies
Quote Total:$2,589.50

NOTES

Estimate includes removal of existing tile and installation of new white subway tile per customer request. Labor rates standard. Valid for 30 days.

How it works

1

Build line-by-line

Add labor and material line items. The total calculates automatically.

2

One click to a job

Accepting a quote instantly creates a matching job with all the details already filled in.

Why contractors choose TradesArrow

Arrow Quote Builder is one piece of a connected system that runs your whole operation — customers, jobs, quotes, invoices, calendar, and your team all in one place. No more switching apps or losing data.

No double-entry — customers, jobs, quotes, and purchasing all stay in sync
Your whole team sees the same live data from any device
Works on phone, tablet, or desktop — no installs required
1-month free trial, no credit card required

Ready to put it to work?

Start your 1-month free trial. No credit card, no setup fees — get your team running in minutes.